- Home
- Login
- Catalog
- Services
- Events Calendar
- Current Magazine
- Adult Events
- Childrens Events
- Summer Reading 2012
- Walter Mosley: Meet the Author
- Events for Seniors
- Summer Reading Events
- Family Events
- National Poetry Month
- Children's Author: A. Louie
- Meet the Council Chair: The Honorable Andrea C. Harrison
- Teen Events
- Thank You
- Titanic Centennial Events
- Library Trivia Scavenger Hunt - National Library Week
- Map for Scavenger Hunt - National Library Week
- National Library Week (NLW)
- Online Library
- Special Collections
- Kids
- Teens
- About Us
- Contact Us
South Bowie
Location
South Bowie (Under Construction)
15301 Hall Road
Bowie, MD 20721United States
38° 54' 12.1392" N, 76° 44' 32.6688" W
See map: Google Maps
Art in Public Places winning proposal for the art in the branch
South Bowie Branch Library (under construction)
The South Bowie Branch Library is a 45,000 SF two story library planned for the Hall Station mixed use development at the intersection of Central Avenue and Hall Road. The development will include the library, credit union, pharmacy, coffee shop and 319 housing units. The library will be the focus and provide a civic presence to the development. While the development encourages pedestrian activity, the library will also have a drive-up service window to pick up and return library materials.
The ground floor of the library will include the children’s, adult and teen areas, and the circulation desk with a collection capacity of 80,000 items. The children’s area will feature a story room with an interactive early literacy activity area, browsing area and a life-size tree in full spring bloom which will define the seating area. The adult area will feature a “living room” for comfortable reading with a fireplace, multiple group study rooms (including one designated just for teens), a quiet study room, 50 computers and a publishing center, and all in a soaring two story space
The upper level of the library will include public meeting rooms, a computer training lab, conference room and the staff area. Some of these public rooms will overlook the main reading room providing dramatic views into the adult area.
Based on Green/Sustainable design principles, the library will follow the criteria outlined in the USGBC LEED rating system. Renewable materials, recycled materials, delighting strategies and energy efficient systems will be used.
The exterior of the library will be compatible with the overall theme of the mixed use development with overhanging roof forms, large windows, brick and precast concrete. The library will feature a large entrance tower signifying its civic presence as well as providing a focal point for the entire development.
|
Construction ProgressAs of 5/8/12: Exterior canopies (over the loading dock and drive-up window) have been installed. The window glass on the second floor has been installed. 2 WEEK LOOK AHEAD: The arched windows on the first floor will be installed. The large arch on the front entrance tower will be completed. The fascia and gutters will be installed. The fireplace vent enclosure will be completed. As of 4/24/12: The window frames have been installed. The exterior brickwork is complete. Roof has been insulated. As of 4/10/12: All the framing for the interior partition walls is complete. Permanent power has been installed. Installation of the pre-cast stone portions of the main entrance tower has begun. As of 3/13/12: The studding out of the second floor partition walls has begun. Exterior brickwork is continuing. As of 2/28/12: Both the flat roof and the mansard roof have been waterproofed. Ductwork has been installed and connected to the HVAC units. As of 2/14/12: Mansard roof framing is complete. The exterior masonry walls have been waterproofed. The HVAC units have been mounted on the roof. Exterior brickwork has begun. As of 1/31/12: Steel framing erection is complete. Construction of the concrete masonry exterior walls is complete. Framing for the two sets of emergency exit stairs has been installed. As of 1/17/12: The mansard roof decking is complete. Pads for the roof-top HVAC units are installed. Approximately 50% of the masonry exterior walls have been completed. As of 1/3/12: The construction of the mansard roof is complete. Sheathing of the roof has begun. The construction of the masonry block walls continues. As of 12/20/11: Installation of the main roof decking is complete. Steel framing for the mansard roof has been installed.
|
|